A #3Dprinted bathroom unit could be the future. #NTUsg researchers and Sembcorp engineers pave the way for construction innovation with a #robotic system that can successfully #3Dprint a bathroom in less than a day. The pre-fabricated bathroom unit is constructed 30% faster than conventional concrete casting method and is as structurally robust.
0 Comments